GTL Construction Portfolio
Client Lists
Testimonals
Work History
 
           
      Page 1, 2, 3, 4    
     

 

   
1988

 

Woodland Subdivision - Jack Matchett

Preformed site preparation work, installed water and sewage mains and serviced six building lots.

         
         
      Sky-View Subdivision - Target Construction Ltd.

Serviced some 26 lots and corresponding roadways located in the former Town of Newcastle.
 
         
         
  1986-87   Village of Doaktown - NB DOT

Reconstructed existing section of provincial highway system including water, storm/sanitary sewer upgrades.
 
         
         
  1985   Cambridge Narrows - NBDOT

Reconstructed section of provincial roadway.
 
         
         
  1984   King George Highway and Pleasant Street upgrades - Town of Newcastle

Replaced existing water and sewage main lines and laterals along Pleasant Street (from the Royal Bank to the Irving Car Wash) and the King George Highway.
 
         
         
  1983-84   Tower Hill Telephone Conduit - New Brunswick Telephone (NBTel)

Developed and installed concrete encased conduit cable at Tower Hill
 
         
         
      Ledden Street - NBDOT

Located in the former Town of Newcastle, GTL was awarded its first DOT contract. GTL performed street upgrading including water, sanitary and storm sewer infrastructure work.
 
         
         
  1982-83   Loggieville Lagoon - Village of Loggieville

Lagoon site excavation and corresponding pipe work connecting lift station.
 
         
         
  1981-82   Sunny Corner Sewage Lagoon - Village of Sunny Corner

Contracted to perform the necessary lagoon excavation and the installation of all piping infrastructure work including manholes and storm and sanitary sewer lines.
 
         
         
         
         
         
         